Conventional generation
Feasibility study to determine the technical, economic, financial, environmental and social feasibility of the installation, construction and operation of the 150MW thermoelectric generation project.
The economic and financial feasibility was determined based on the results obtained from the modeling of three scenarios of national electricity demand and three scenarios of electricity generation supply, in which the new generation project was included.
Regarding environmental and social feasibility, the environmental impact study was prepared following the TOR and the General Methodology for the preparation and presentation of environmental studies established by the environmental authority.